A driveway too tight for comfortable vehicle access, widened by moving the wall and pillar 0.7 m before a full two-day preparation and surfacing transformation.

LOCATIONDunblane, Stirlingshire
PROJECT TYPEDriveway & Access Widening
TURNAROUNDCompleted in Two Days
FINISH10 mm Enriched Tarmac
THE PROJECT

WIDER ACCESS.
BUILT INTO THE JOB.

The original slabbed driveway had a tight entrance between the boundary pillars. GMGB moved the wall and pillar over by 0.7 m to create more usable vehicle access before rebuilding and surfacing the driveway.

Wall and pillar moved 0.7 mAll old slabs removedHeel-kerb edging installedSeparation membrane installedACO channel drainageTwo-day turnaround
Original slab driveway and narrow entrance before work in Dunblane
01 / BEFORE

A TIGHT, TIRED ENTRANCE.

The old slabs had reached the end of their useful life, while the position of the entrance pillar restricted the available width for vehicles.

GMGB excavating the old driveway in Dunblane
02 / ACCESS & EXCAVATION

OPENED UP PROPERLY.

All the old slabs were removed and the driveway excavated. The wall and pillar were moved 0.7 m to create a noticeably wider, more practical entrance.

Separation membrane laid during Dunblane driveway preparation
03 / PREPARATION

A BASE BUILT TO LAST.

A separation membrane was installed across the formation before the new base was placed and prepared to the required levels.

Prepared driveway base with new entrance layout in Dunblane
04 / DRAINAGE & EDGES

LEVELS UNDER CONTROL.

Heel kerbs replaced the old slab edges, while an ACO channel drainage system was installed at the entrance before the final surfacing work.

THE RESULT

A WIDER, CLEANER DRIVEWAY.

Completed widened tarmac driveway viewed from the street in Dunblane

The completed driveway gives the customer more room to enter and leave the property, with a low-maintenance 10 mm enriched tarmac finish, defined heel kerbs and ACO drainage integrated across the widened entrance.