POTHOLES & TARMAC MAINTENANCE.
Real GMGB repair and maintenance work—from individual potholes and paths to yard spaces, entrances and private access roads.
THE SAME CARE AT EVERY SCALE.
Localised repairs are cut out and prepared before fresh material is placed and compacted. The result is a sounder, cleaner working surface without unnecessary replacement of the whole area.
TWO POTHOLES. BEFORE & AFTER.
Both failed areas are now shown from damage through to the completed, compacted tarmac repair.
CUMBERNAULD • REPAIR 01 • BEFORE
CUMBERNAULD • REPAIR 01 • AFTER
CUMBERNAULD • REPAIR 02 • BEFORE
CUMBERNAULD • REPAIR 02 • AFTER
MULTIPLE FAILED AREAS REPAIRED.
The finished tarmac reinstatements around the working area and service covers, shown clearly after compaction.
MOTHERWELL • COMPLETED REPAIR 01
MOTHERWELL • COMPLETED REPAIR 02
MOTHERWELL • COMPLETED REPAIR 03
MOTHERWELL • COMPLETED REPAIR 04
THREE REPAIRS. CLEAN FINISH.
Each damaged area is shown before work and again after it was opened up, prepared and compacted with fresh tarmac.
COATBRIDGE • REPAIR 01 • BEFORE
COATBRIDGE • REPAIR 01 • AFTER
COATBRIDGE • REPAIR 02 • BEFORE
COATBRIDGE • REPAIR 02 • AFTER
COATBRIDGE • REPAIR 03 • BEFORE
COATBRIDGE • REPAIR 03 • AFTER
POTHOLE & PRIVATE-ROAD WORK.
A localised pothole repair and a separate private access road finished in tarmac.
GLASGOW POTHOLE • BEFORE
GLASGOW POTHOLE • AFTER
SEPARATE GLASGOW PRIVATE-ROAD PROJECT
GLASGOW PRIVATE ROAD • FINISHED 01
GLASGOW PRIVATE ROAD • FINISHED 02
GLASGOW PRIVATE ROAD • FINISHED 03
ENTRANCE ROAD REPAIR.
The damaged entrance edge was prepared and reinstated with fresh tarmac, leaving a neat transition into the adjoining road and access.
KNIGHTSWOOD ENTRANCE • BEFORE
KNIGHTSWOOD ENTRANCE • AFTER
YARD SPACE FRESHENED UP.
An untidy and worn yard space was cleared and surfaced to create a cleaner, more useful area.
PAISLEY YARD • BEFORE 01
PAISLEY YARD • BEFORE 02
PAISLEY YARD • FINISHED
GARDEN PATH RENEWAL.
The customer wanted a fresh, tidy path after becoming fed up with weeds and broken tarmac.
UDDINGSTON PATH • BEFORE
UDDINGSTON PATH • DURING PREPARATION
UDDINGSTON PATH • AFTER
“Just had my path done with the boys and I couldn't have asked for better! They are very professional and tidy up after themselves. I'll be getting them back to do my drive.”G71 • 3 SEPTEMBER 2026
NEW WALL & TARMAC STRIP.
A compact improvement in front of the house combining a newly installed wall with a clean tarmac strip.
BOTHWELL WALL & STRIP • BEFORE 01
BOTHWELL • BEFORE TARMAC
BOTHWELL WALL & STRIP • FINISHED DETAIL
BOTHWELL WALL & STRIP • FINISHED
CAR-PARK & GARAGE ENTRANCE REPAIRS.
Damaged potholes at the entrance to a parking and garage area were repaired to restore a safer, cleaner access surface.
PORT GLASGOW ENTRANCE • BEFORE 01
PORT GLASGOW ENTRANCE • BEFORE 02
PORT GLASGOW ENTRANCE • COMPLETEDHOLIDAY PARK RECEPTION ENTRANCE.
Approximately 100m² of 10mm enriched material was hand laid around the new reception building at Inverbeg Holiday Park for Aspire.
LOCH LOMOND • RECEPTION ENTRANCE
LOCH LOMOND • RECEPTION ACCESS
LOCH LOMOND • FINISHED 01
LOCH LOMOND • FINISHED 02
HAVE A DAMAGED SURFACE?
Send the location and photographs so GMGB can assess the repair.