GMGB
SURFACING
REPAIRS • REINSTATEMENT • SMALL WORKS

POTHOLES & TARMAC MAINTENANCE.

Real GMGB repair and maintenance work—from individual potholes and paths to yard spaces, entrances and private access roads.

10AREAS SHOWN
11REAL JOBS
1LOCAL TEAM
SMALL JOBS, PROPERLY FINISHED

THE SAME CARE AT EVERY SCALE.

Localised repairs are cut out and prepared before fresh material is placed and compacted. The result is a sounder, cleaner working surface without unnecessary replacement of the whole area.

POTHOLE REPAIRS TARMAC PATCHING PATH RENEWALS YARDS & ENTRANCES PRIVATE ACCESS ROADS SURFACE REINSTATEMENT
CUMBERNAULD

TWO POTHOLES. BEFORE & AFTER.

Both failed areas are now shown from damage through to the completed, compacted tarmac repair.

First Cumbernauld pothole before repairCUMBERNAULD • REPAIR 01 • BEFORE
Cumbernauld pothole after repairCUMBERNAULD • REPAIR 01 • AFTER
Second Cumbernauld pothole before repairCUMBERNAULD • REPAIR 02 • BEFORE
Second Cumbernauld pothole after repairCUMBERNAULD • REPAIR 02 • AFTER
MOTHERWELL

MULTIPLE FAILED AREAS REPAIRED.

The finished tarmac reinstatements around the working area and service covers, shown clearly after compaction.

Motherwell repair finishedMOTHERWELL • COMPLETED REPAIR 01
Second Motherwell repair finishedMOTHERWELL • COMPLETED REPAIR 02
Compacted Motherwell tarmac reinstatementMOTHERWELL • COMPLETED REPAIR 03
Completed Motherwell pothole repairMOTHERWELL • COMPLETED REPAIR 04
COATBRIDGE

THREE REPAIRS. CLEAN FINISH.

Each damaged area is shown before work and again after it was opened up, prepared and compacted with fresh tarmac.

First Coatbridge pothole before repairCOATBRIDGE • REPAIR 01 • BEFORE
Coatbridge pothole repairedCOATBRIDGE • REPAIR 01 • AFTER
Second Coatbridge pothole before repairCOATBRIDGE • REPAIR 02 • BEFORE
Coatbridge tarmac patch afterCOATBRIDGE • REPAIR 02 • AFTER
Third Coatbridge pothole before repairCOATBRIDGE • REPAIR 03 • BEFORE
Third Coatbridge repair afterCOATBRIDGE • REPAIR 03 • AFTER
GLASGOW

POTHOLE & PRIVATE-ROAD WORK.

A localised pothole repair and a separate private access road finished in tarmac.

Glasgow pothole before repairGLASGOW POTHOLE • BEFORE
Glasgow pothole after repairGLASGOW POTHOLE • AFTER

SEPARATE GLASGOW PRIVATE-ROAD PROJECT

Finished private tarmac road in GlasgowGLASGOW PRIVATE ROAD • FINISHED 01
Private road tarmac finishGLASGOW PRIVATE ROAD • FINISHED 02
Completed Glasgow private access roadGLASGOW PRIVATE ROAD • FINISHED 03
KNIGHTSWOOD • GLASGOW

ENTRANCE ROAD REPAIR.

The damaged entrance edge was prepared and reinstated with fresh tarmac, leaving a neat transition into the adjoining road and access.

Damaged entrance road surface before repair in Knightswood, GlasgowKNIGHTSWOOD ENTRANCE • BEFORE
Finished tarmac entrance road repair in Knightswood, GlasgowKNIGHTSWOOD ENTRANCE • AFTER
PAISLEY

YARD SPACE FRESHENED UP.

An untidy and worn yard space was cleared and surfaced to create a cleaner, more useful area.

Paisley yard before work with person removedPAISLEY YARD • BEFORE 01
Paisley yard before surfacingPAISLEY YARD • BEFORE 02
Paisley yard after surfacingPAISLEY YARD • FINISHED
UDDINGSTON

GARDEN PATH RENEWAL.

The customer wanted a fresh, tidy path after becoming fed up with weeds and broken tarmac.

Uddingston garden path before workUDDINGSTON PATH • BEFORE
Uddingston garden path during preparationUDDINGSTON PATH • DURING PREPARATION
Freshly finished Uddingston tarmac pathUDDINGSTON PATH • AFTER
10/10 • VERIFIED CHECKATRADE REVIEW
“Just had my path done with the boys and I couldn't have asked for better! They are very professional and tidy up after themselves. I'll be getting them back to do my drive.”
G71 • 3 SEPTEMBER 2026
BOTHWELL

NEW WALL & TARMAC STRIP.

A compact improvement in front of the house combining a newly installed wall with a clean tarmac strip.

Bothwell frontage before workBOTHWELL WALL & STRIP • BEFORE 01
New Bothwell wall and entrance strip before tarmac surfacingBOTHWELL • BEFORE TARMAC
Finished angle of the new Bothwell wall and tarmac stripBOTHWELL WALL & STRIP • FINISHED DETAIL
Completed wall and tarmac strip in BothwellBOTHWELL WALL & STRIP • FINISHED
PORT GLASGOW

CAR-PARK & GARAGE ENTRANCE REPAIRS.

Damaged potholes at the entrance to a parking and garage area were repaired to restore a safer, cleaner access surface.

Damaged Port Glasgow entrance before pothole repairPORT GLASGOW ENTRANCE • BEFORE 01
Second view of potholes at the Port Glasgow entrancePORT GLASGOW ENTRANCE • BEFORE 02
Port Glasgow car park and garage entrance after repairPORT GLASGOW ENTRANCE • COMPLETED
INVERBEG • LOCH LOMOND

HOLIDAY PARK RECEPTION ENTRANCE.

Approximately 100m² of 10mm enriched material was hand laid around the new reception building at Inverbeg Holiday Park for Aspire.

Inverbeg Holiday Park reception entrance surfacingLOCH LOMOND • RECEPTION ENTRANCE
Surfacing around the reception building at Loch LomondLOCH LOMOND • RECEPTION ACCESS
Hand-laid tarmac finish at Inverbeg Holiday ParkLOCH LOMOND • FINISHED 01
Completed reception entrance surfacing at InverbegLOCH LOMOND • FINISHED 02

HAVE A DAMAGED SURFACE?

Send the location and photographs so GMGB can assess the repair.

REQUEST A REPAIR QUOTE →